2", 12-18 months
The partition is mounted directly on the concrete with round brackets either with wedge or chemical anchors and the arcs are connected to each other with 1,5 inch hot dip galvanized front pipe and 1,5 inch hot dip galvanized neck rail pipe. Our most cost-effective solution.